2025-12-29
(25/12/30)
- KYS: Maintenance (2025.09.01. ~ ). CTR will be available in Feb. 2026. 150/230 GHz receiver will be available in 26B season.
- KUS: In operation.
- KTN: In operation.
- KPC: In operation. 150/230 GHz receiver will be available in Mar. 2026.
KPC was not operational due to a subreflector problem (2025.12.26. ~ 2025.12.30.), but has now been fixed.